Home / Where We Build / Madeira Beach
Madeira Beach, FL
Building a New Home in Madeira Beach, Florida
Madeira Beach sits at the south end of Sand Key, at John's Pass, about 13 miles from our Clearwater office. The whole city lies inside a FEMA Special Flood Hazard Area, so every new home here is an elevated home. The city runs its own building department at 300 Municipal Drive. We know Madeira Beach firsthand: our team led the restoration of Villa Madeira after Hurricane Helene. Our new homes here go on pile foundations and are built indoors while the foundation goes in.
Madeira Beach at a glance
| Island | Sand Key (south end) |
|---|---|
| Permits issued by | City of Madeira Beach Building Department, 300 Municipal Drive |
| Flood zones | Entire city in a Special Flood Hazard Area |
| Distance from our office | About 13 miles |
| Our work here | Villa Madeira Hurricane Restoration |
| Flood map in effect | FEMA Flood Insurance Rate Map effective August 24, 2021 |
| Minimum floor height | The Florida Building Code requires at least one foot above base flood elevation. Some towns require more. |
| Gulf-front lots | Building seaward of the Coastal Construction Control Line needs a separate permit from the Florida Department of Environmental Protection. |
| How we build | New elevated homes on pile foundations, built indoors while the foundation goes in, engineered for 180 mph winds |
| Typical timeline | Six to ten months, end to end |
| Builder | Rapid Rebuild Homes, the residential program of The Partners Contracting Group, Inc. Florida license CGC1535546. 25+ years of exceptional building. |
Reviewed by Jordan Bull, Florida Certified General Contractor, license CGC1535546. Last reviewed November 2026.
Building in Madeira Beach
FEMA Flood Insurance Rate Map for Madeira Beach, panel 12103C0191H, effective August 24, 2021. Source: FEMA. Check your own lot on the live FEMA map.
Building & zoning department
City of Madeira Beach Building Department
FEMA flood map
Municipal code
Our work in Madeira Beach
Villa Madeira hurricane restoration
Villa Madeira, a 50-unit oceanfront condominium in Madeira Beach, sustained significant damage from Hurricane Helene. TPC Group removed debris, remediated storm-affected units and rebuilt the lobby and pool bathrooms.
Designs that suit Madeira Beach lots
Every design is already engineered. Start from one and make it yours.
Respected by your neighbors
“When Helene and Milton hit, Jordan Bull treated our entire Villa Madeira community like his own family from day one. Caring, trustworthy, and he did everything he could to make us whole again. You don’t find people like this anymore. Highly recommend.”
“Helene and Milton left so many headaches behind. Fortunately Jordan and the assets his company brought to our aid so rapidly and across so many disciplines, is bringing our property and our 50 units closer everyday to a return to normal operation. The Partners Contracting Group is one stop source every property facing the challenges of severe weather events needs to recover.”
Frequently asked questions
Who issues building permits in Madeira Beach?
The City of Madeira Beach Building Department issues building permits, from its office at 300 Municipal Drive. We work with the city through plan review, permitting and inspections on every new elevated home we build in Madeira Beach, and we know the community from the Villa Madeira restoration.
What flood zone is Madeira Beach in?
The whole city of Madeira Beach lies inside a FEMA Special Flood Hazard Area, on the FEMA Flood Insurance Rate Map effective August 24, 2021. That means every new home here is an elevated home. The exact zone and base flood elevation change lot by lot, so check your address on the live FEMA map.
How high does a new home in Madeira Beach have to be built?
The Florida Building Code requires a new home to sit at least one foot above base flood elevation, and some towns require more. In Madeira Beach, we confirm the base flood elevation for your lot on the FEMA map and the local rules, then set the finished floor of your home from those numbers.
Do I need a state permit to build on the Gulf in Madeira Beach?
Yes, if your lot sits seaward of the Coastal Construction Control Line. Building there needs a separate permit from the Florida Department of Environmental Protection, in addition to the city building permit. For a Gulf-front lot in Madeira Beach, we check where your lot falls against that line before design starts.
How long does it take to build a new home in Madeira Beach?
A new elevated home in Madeira Beach typically takes six to ten months, end to end. The home is built indoors while the pile foundation goes in on your lot, so the two run at the same time instead of one after the other. Permit review times can move the start date.
How far is Rapid Rebuild Homes from Madeira Beach?
About 13 miles. Rapid Rebuild Homes is based at 601 Cleveland St, Suite 500, Clearwater, FL 33755, and builds new elevated homes on pile foundations across the Pinellas beach towns, including Madeira Beach. Call (727) 209-7661 to talk about your lot.